How long does it take to cover a 10,000 m2 production hall with Wirepas anchors?

Wirepas’s appeal is precisely installation speed: anchors are battery-powered, with no cabling. But the right answer is not a single number - it is the result of dimensioning, and on-site work is only one of the time factors.

How coverage works with Wirepas

Positioning is RSSI-based: fixed anchors measure the moving tags’ signal, the gateway forwards it to the cloud, and the positioning engine computes the location there. Because the anchors are battery-powered, installing them is mounting work, not electrical work - the system’s biggest speed advantage over cabled infrastructure.

The dimensioning factors

According to Wirepas’s official dimensioning guide, anchor density and gateway count are driven by the number of tags, the required position update rate, the target accuracy (higher density = better accuracy), and the nature of the environment. An open hall with little metal and a high-bay warehouse with dense racking do not mean the same anchor count per square metre.

What actually drives on-site time

In an open 10,000 m2 hall, pure anchor installation is multi-stage on-site work; the concrete duration comes from the site survey, based on racking, target accuracy, tag count and update rate.

What to provide for an estimate

A floorplan, racking and equipment layout, the number of objects to track, the target accuracy and update cadence, and which zones are critical. From these, the Wirepas dimensioning tool computes the anchor and gateway count - and from that, the on-site time can be estimated.